Description:
This project for California American Water included the construction of a new booster pump station and installation of approximately 650 feet of 24-inch discharge waterline at the Forest Lake Storage Tank site in Pebble Beach. The work involved site mobilization, underground piping, pump station construction with a precast concrete building, utility vaults, new electrical and instrumentation systems, a PG&E service upgrade, and a standby generator. The project also included environmental protection, site restoration, and coordination with local, state, and federal agencies to maintain uninterrupted water service during construction.
Owner: California American Water
Contract Value: $3M
Location: Pebble Beach, CA
Project Manager: Joe Taormina