Grading Archives - Monterey Peninsula Engineering Website https://mpe2000.info/portfolio-tag/grading/ Award Winning Civil Contractor in the Tri-County Area Thu, 05 Jun 2025 17:38:18 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.3 https://mpe2000.info/wp-content/uploads/2022/02/cropped-MPE-Site-Icon-32x32.png Grading Archives - Monterey Peninsula Engineering Website https://mpe2000.info/portfolio-tag/grading/ 32 32 Glorya Jean Tate Park Site Improvements & Pump Track https://mpe2000.info/portfolio-item/glorya-jean-tate-park-site-improvements-pump-track/?utm_source=rss&utm_medium=rss&utm_campaign=glorya-jean-tate-park-site-improvements-pump-track Fri, 15 Sep 2023 23:33:22 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7997 The project includes removing existing features, performing earthwork and grading, and installing new pavements, drainage, pump track, furniture, signage, irrigation, and landscaping.

The post Glorya Jean Tate Park Site Improvements & Pump Track appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
Site improvements include the demolition of existing ADA parking stall, fencing, irrigation, landscaping, hardscape and clear and grub. Work includes earthwork and grading operations, including the installation of new concrete paving, asphalt paving, drainage, bike pump track, site furnishings, signage, irrigation, and landscaping.

Owner: City of Marina

Contract Value: $1.08M

Location: Marina, CA

Project Manager: Peter Bruno

The post Glorya Jean Tate Park Site Improvements & Pump Track appeared first on Monterey Peninsula Engineering Website.

]]>
Pebble Beach Pump Station https://mpe2000.info/portfolio-item/pebble-beach-pump-station/?utm_source=rss&utm_medium=rss&utm_campaign=pebble-beach-pump-station Thu, 16 Feb 2023 17:19:14 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7985 2023 APWA Award winner featuring a new booster pump station and 650 feet of 24-inch waterline at Cal Am’s Forest Lake site in Pebble Beach.

The post Pebble Beach Pump Station appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
This project for California American Water included the construction of a new booster pump station and installation of approximately 650 feet of 24-inch discharge waterline at the Forest Lake Storage Tank site in Pebble Beach. The work involved site mobilization, underground piping, pump station construction with a precast concrete building, utility vaults, new electrical and instrumentation systems, a PG&E service upgrade, and a standby generator. The project also included environmental protection, site restoration, and coordination with local, state, and federal agencies to maintain uninterrupted water service during construction.

Owner: California American Water

Contract Value: $3M

Location: Pebble Beach, CA

Project Manager: Joe Taormina

The post Pebble Beach Pump Station appeared first on Monterey Peninsula Engineering Website.

]]>
Ellis Park Improvements https://mpe2000.info/portfolio-item/ellis-park-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=ellis-park-improvements Tue, 19 Jul 2022 21:55:19 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7943 Renovation of Ellis Park in Seaside, CA with new landscaping, irrigation, playground upgrades, ADA-compliant access, and enhanced site features to improve community recreation and usability.

The post Ellis Park Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
Construction includes removal of existing drystack keystone wall, demolition of curb, gutter and sidewalk, clearing and grubbing, and excavation of sand for play area. The project includes providing and installing new play equipment and wood fiber play area, site furnishings, paving, walks, curbs, construction of driveway and ADA parking stall, and construction of Trex boardwalk.

Owner: City of Seaside

Contract Value: $740K

Location: Seaside, CA

Project Manager: Peter Bruno

Announcements:

Monterey Peninsula Engineering would like to announce potential business opportunities with the Ellis Park Improvements Project #342-8910-9574 located in the City of Seaside.Business opportunities may be available to local construction and non-construction businesses.

For more information, please contact at Info@mpe2000.com.

 

Monterey Peninsula Engineering would like to announce potential employment opportunities for the positions listed below with the Ellis Park Improvements Project #342-8910-9574 in the City of Seaside. We are giving priority to individuals who may qualify as local Section 3 Residents.

Please contact at Info@mpe2000.com.

Trades:

  • Laborers
  • Operators
  • Journeyman
  • Apprentices
  • Trainees

The post Ellis Park Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Carmel Valley Pump Station https://mpe2000.info/portfolio-item/carmel-valley-pump-station/?utm_source=rss&utm_medium=rss&utm_campaign=carmel-valley-pump-station Thu, 14 Apr 2022 23:48:45 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7891 Carmel Valley’s new water pump station improves system pressure and reliability through upgraded utilities, controls, and mechanical infrastructure.

The post Carmel Valley Pump Station appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
This water pump station project in Carmel Valley included excavation, underground utility installation, mechanical systems, electrical controls, and site work to enhance water distribution. The station boosts system pressure and reliability for the surrounding community, supporting long-term infrastructure resilience.

Owner: California American Water

Contract Value: $3M

Location: Carmel Valley

Project Manager: Joe Taormina

The post Carmel Valley Pump Station appeared first on Monterey Peninsula Engineering Website.

]]>
Colton Middle School Courtyard https://mpe2000.info/portfolio-item/colton-middle-school-courtyard/?utm_source=rss&utm_medium=rss&utm_campaign=colton-middle-school-courtyard Tue, 15 Feb 2022 19:14:45 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7114 Upgraded courtyard at Colton Middle School with concrete, drainage, and ADA improvements—creating a safer and more accessible space for students and staff.

The post Colton Middle School Courtyard appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
The Colton Middle School Courtyard project included demolition, grading, drainage, concrete flatwork, and ADA-compliant access improvements. The enhanced courtyard provides students and staff with a safer, more functional, and visually appealing outdoor space for learning and recreation.

Owner: Monterey Peninsula Unified School District

Contract Value: $450K

Location: Monterey, CA

Project Manager: Peter Bruno

The post Colton Middle School Courtyard appeared first on Monterey Peninsula Engineering Website.

]]>
Vacuum Truck Site Improvements https://mpe2000.info/portfolio-item/vacuum-truck-site-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=vacuum-truck-site-improvements Tue, 15 Feb 2022 17:22:52 +0000 https://mpe2000.info/?post_type=portfolio-item&p=7081 Utility upgrades at SCRWA created a dedicated vacuum truck waste station with new paving, trenching, drainage, and utility work for safer, compliant operations.

The post Vacuum Truck Site Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
The SCRWA Vacuum Truck Waste Receiving Station project involved site demolition, grading, concrete paving, drainage, trenching, piping, fencing, and utility tie-ins to construct a dedicated discharge area for vacuum truck waste. Located at the South County Regional Wastewater Authority, this facility enhances operational efficiency and ensures environmentally compliant disposal processes.

Owner: South County Regional Wastewater Authority

Contract Value: $1.1M

Location: Morgan Hill, CA

Project Manager: Peter Taormina

The post Vacuum Truck Site Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Lower Stilwell Neighborhood Improvements https://mpe2000.info/portfolio-item/lower-stilwell-neighborhood-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=lower-stilwell-neighborhood-improvements Mon, 14 Feb 2022 23:05:08 +0000 https://mpe2000.info/?post_type=portfolio-item&p=6975 Lower Stilwell revitalization included grading, underground utility installation, paving, and sitework to modernize infrastructure for future neighborhood development.

The post Lower Stilwell Neighborhood Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
The Lower Stilwell Neighborhood Improvements project involved demolition of existing infrastructure, trenching, grading, installation of underground utilities, new concrete flatwork, paving, and site restoration. These improvements were part of a broader revitalization effort aimed at preparing the area for new development and enhancing infrastructure reliability.

Owner: Clark Realty Builders

Contract Value: $8M

Location: Marina, CA

Project Manager: Bart Bruno

The post Lower Stilwell Neighborhood Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
7th Ave Parking Lot https://mpe2000.info/portfolio-item/csumb-7th-ave-parking-lot/?utm_source=rss&utm_medium=rss&utm_campaign=csumb-7th-ave-parking-lot Mon, 14 Feb 2022 22:02:30 +0000 https://mpe2000.info/?post_type=portfolio-item&p=6935 CSUMB 7th Avenue Parking Lot improvements included paving, striping, drainage, and lighting—enhancing safety and capacity for the university’s growing campus needs.

The post 7th Ave Parking Lot appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
This project at California State University, Monterey Bay (CSUMB) included the construction of a new paved parking lot along 7th Avenue. Work included grading, asphalt paving, striping, drainage infrastructure, lighting, and signage to increase on-campus parking capacity and improve circulation and safety for students and staff.

Owner: California State University, Monterey Bay

Contract Value: $3.8M

Location: Seaside, CA

Project Manager: Bart Bruno

The post 7th Ave Parking Lot appeared first on Monterey Peninsula Engineering Website.

]]>
Main St Streetscape Improvements https://mpe2000.info/portfolio-item/main-street-streetscape-salinas/?utm_source=rss&utm_medium=rss&utm_campaign=main-street-streetscape-salinas Mon, 14 Feb 2022 13:00:36 +0000 https://mpe2000.info/?post_type=portfolio-item&p=6784 Award winning $8M downtown Salinas improvement project.

The post Main St Streetscape Improvements appeared first on Monterey Peninsula Engineering Website.

]]>
Description:
Surveying and construction staking; removal and salvage or disposal of existing improvements; roadway and pavement reconstruction, construction of curb and gutter, sidewalk, ADA compliant pedestrian access ramps, drainage improvements, lighting improvements, electrical improvements, utility trenching, landscape and irrigation improvements; signing and marking; traffic signal modifications

Owner: City of Salinas

Contract Value: $7.9M

Location: Salinas

Project Manager: Bart Bruno

The post Main St Streetscape Improvements appeared first on Monterey Peninsula Engineering Website.

]]>